These random boards happened on the 30th, not sure of the purpose still
They are on the ceiling to the "man cave"/ floor of the master bedroom
All the walls laying on the floor waiting to be put up
Look down from the garage into the man cave then basement
They took the day off from framing on the 1st, but even with the snow they were back to work on the 2nd. I still can't believe how quick these guys work.
We have a whole first floor
Our living room
Kitchen/pantry/ informal dinning room
Formal dinning and part of the foyer
Now on the 3rd I didn't get to check out the house very much since I had NASTY stomach bug come my way. I did convince my mom however to drive by the house after she had to come and pick me up from work. Needless to say I have no pictures of the house on the 4th as I just laid in bed with Bosco all day and night. Matt drove by the house though and said it didn't look like any work was done on the house but the roof was dropped off.
We have a second floor :)
On the 5th we got the framing for the roof and it seems all the framing is DONE!! When I showed up after work they were just finishing up. It was kinda fun to see them lift the huge pieces onto the house. From the first picture to the last it only took them around 15 minutes...CRAZY!!
It is exciting for it to start looking like a house!!